Modify Replication Schedules

Revision as of 21:23, 18 August 2022 by Qadmin (talk | contribs)

Modify an existing Replication Schedule. Schedules can be configured to trigger at specific dates/times during the week or can be setup to continuously replicate with a variable delay interval between replication cycles. Retention rules can also be modified.

Navigation: Remote Replication --> Volume & Share Replication Schedules --> Replication Schedule --> Modify (toolbar)

General

 

Schedule Interval

 

Snapshot Rules

 

Automatic Activation

 


Return to Using the Web Interface