Difference between revisions of "Modify Replication Schedules"

From OSNEXUS Online Documentation Site
Jump to: navigation, search
m
m
Line 1: Line 1:
Modify an existing Replication Schedule.  
+
Modify an existing Replication Schedule. Schedules can be configured to trigger at specific dates/times during the week or can be setup to continuously replicate with a variable delay interval between replication cycles.
  
  

Revision as of 07:23, 6 April 2017

Modify an existing Replication Schedule. Schedules can be configured to trigger at specific dates/times during the week or can be setup to continuously replicate with a variable delay interval between replication cycles.


Modify Replication Schedule.png


Return to the QuantaStor Web Admin Guide