Difference between revisions of "Modify Replication Schedules"
From OSNEXUS Online Documentation Site
m |
m |
||
Line 1: | Line 1: | ||
− | Modify an existing Replication Schedule. Schedules can be configured to trigger at specific dates/times during the week or can be setup to continuously replicate with a variable delay interval between replication cycles. | + | Modify an existing Replication Schedule. Schedules can be configured to trigger at specific dates/times during the week or can be setup to continuously replicate with a variable delay interval between replication cycles. Retention rules can also be modified. |
Revision as of 09:04, 7 September 2017
Modify an existing Replication Schedule. Schedules can be configured to trigger at specific dates/times during the week or can be setup to continuously replicate with a variable delay interval between replication cycles. Retention rules can also be modified.